[1]
2021. IMPROVING THE CAPACITY OF BORED PILES BY BASE GROUTING CASE STUDY; SINNAR BRIDGES PROJECT IN SUDAN. University of Khartoum Engineering Journal. 11, 1 (أغسطس 2021). DOI:https://doi.org/10.53332/kuej.v11i1.152.