(1)
IMPROVING THE CAPACITY OF BORED PILES BY BASE GROUTING CASE STUDY; SINNAR BRIDGES PROJECT IN SUDAN. uoflej 2021, 11 (1). https://doi.org/10.53332/kuej.v11i1.152.