[1]
“IMPROVING THE CAPACITY OF BORED PILES BY BASE GROUTING CASE STUDY; SINNAR BRIDGES PROJECT IN SUDAN”, uoflej, vol. 11, no. 1, Aug. 2021, doi: 10.53332/kuej.v11i1.152.